| Availability: | |
|---|---|
| Quantity: | |
FP-18650-S
Funpack
Voltage: 60V Cycle life: 1000 times
Capacity: 20Ah Cell model: 18650 Cells
Dimension: TEB Warranty: one Year
Product Type: Lithium ion Battery 60V
| Item | Specification |
| Cell | 18650 |
| Battery model | FP-16850-S |
| Max capacity | 60V 20Ah |
| Outgoing voltage | >60V |
| working temperature | |
| Charge | 0~45℃ |
| Discharge | -20~60℃ |
BMS
| Item | Content | Criterion |
OVC | Over charge detection voltage | 4.250±0.050V |
| Detection delay time | 1.0±0.3S | |
| Over charge release voltage | 4.150±0.050V | |
OVD | Over discharge detection voltage | 2.700±0.080V |
| Detection delay time | 1.0±0.3S | |
| Over discharge release voltage | 3.000±0.100V | |
| Rated operational current | ≤20A | |
OCD | Primary over current detection current | 50±5A |
| Primary detection delay time | 800mS-1200mS | |
| Secondary over current detection curren | 100±10A | |
| Secondary detection delay time | 50mS-200mS | |
| Short protection | Detection condition | >200A, 200uS-300uS |
| Protection | yes Exist | |
| Protective release condition | Disconnect short circuit | |
| Charging management | Charging overvoltage protection voltage | 43.5±0.4V |
| Rated charging current | 3A | |
| Software overcharges | 4±0.2A | |
| Detection delay time | 300mS-600mS | |
| Temperature protection | Charging high temperature protection temperature | 50±4℃ |
| Charging protection recovery temperature | 47±4℃ | |
| Discharge high temperature protection temperature | 70±4℃ | |
| Discharge protection recovery temperature | 55±4℃ | |
| Low temperature protect temperature of charging | 0±4℃ | |
| Low temperature recovery temperature of charging | 5±4℃ | |
| Interior resistance | Main loop electrify resistance | ≤60mΩ |
| The static current | Since the power consumption | ≤60.0uA |
| NTC | YES Exist | 10K±1% B3435±1% |



OEM/ODM Service:
If you want to display your own brand logo in products, bags, labels or anywhere.
Our OEM and ODM services are ready to do it.
Supply Ability:
1000 Pieces per Day
Delivery Time:
- Material Preparation Time: 7-15 days (or inventory)
- Production & Assembly Time 3-10 days
- Testing & Packaging Time: 2-10 days
- Total Delivery Time: 30-45days
- The faster delivery could be negotiable.